Often, yes, but check three things first.
- Code: many areas allow metal over one layer of shingles, not two. Check with your local building department.
- Deck condition: soft or rotted decking must be repaired first.
- Method: install a synthetic underlayment over the shingles, or add purlins (furring strips) to create a flat, ventilated base.
Purlins are the better choice when the shingles are uneven or you want an air space under the metal; underlayment alone is faster and adds less height at the edges.
Pros and cons
| Pros | Cons |
|---|---|
| No tear-off cost or mess | Adds weight |
| Extra insulation layer | Hides deck problems |
| Faster project | Some warranties require a tear-off |
Choose the panel: panel profiles compared.